Diferencia entre revisiones de «GPT74P (Rio Yelcho)»
(→Images) |
(→Season 2021/22) |
||
Línea 23: | Línea 23: | ||
==Season 2022/23== | ==Season 2022/23== | ||
+ | |||
+ | ==Season 2023/24== | ||
+ | |||
+ | * 2023-Nov-06 to 2023-Nov-09 / 3 days/ Packrafting/ Northbound / GPT 74P Rio Yelcho / Jordan Jennings | ||
+ | |||
+ | My time on Rio Yelcho succeeded days of heavy rain. The river was swollen and very pushy. My guess is that it was moving at around 12km/h. Maybe more. I appreciated headwinds. | ||
+ | |||
+ | Saying this, the biggest risks that I noted were the many (and usual) partially submerged trees. The first rapid, I easily portaged. There was even an eddy in perfect proximity in an adjacent creek flowing into Yelcho which allowed for an easy reentry. The second rapid, although I knew where it was on my gps, I passed without noticing. Perhaps it is more prominent with lower levels of water. | ||
+ | |||
+ | On my final day, I got a beautiful sunny day after 6 days of rain. From my camp 2/3rds down the river, I watched the sun come up over a gentle mist rolling down the valley. When the sun hit the mist, it lit up a stunning golden. One of the most spectacular sights I have ever seen. | ||
==Season 2021/22== | ==Season 2021/22== |
Revisión del 15:14 20 nov 2023
Add a new log entry always on top in the appropriate season sub-chapter and use format:
* Start Date to Finish Date (use Format YYYY-MMM-DD) / Duration in Days / Hiking or Packrafting / Travel Direction (SOBO for Southbound or NOBO Northbound) / Chosen Route and/or Option Name (RR for Regular Route) / Names or Alias
Summary with remarks to route that are considered useful for other hikers and packrafters. Include alerts, suggestions and personal perception of attractiveness and difficulties.
Add a sub-chapter by placing two "=" before and after the new sub-chapter heading ('==Sub-Chapter Heading==').
Contenido
Section Log, Alerts and Suggestions
Season 2025/26
Season 2024/25
Season 2023/24
Season 2022/23
Season 2023/24
- 2023-Nov-06 to 2023-Nov-09 / 3 days/ Packrafting/ Northbound / GPT 74P Rio Yelcho / Jordan Jennings
My time on Rio Yelcho succeeded days of heavy rain. The river was swollen and very pushy. My guess is that it was moving at around 12km/h. Maybe more. I appreciated headwinds.
Saying this, the biggest risks that I noted were the many (and usual) partially submerged trees. The first rapid, I easily portaged. There was even an eddy in perfect proximity in an adjacent creek flowing into Yelcho which allowed for an easy reentry. The second rapid, although I knew where it was on my gps, I passed without noticing. Perhaps it is more prominent with lower levels of water.
On my final day, I got a beautiful sunny day after 6 days of rain. From my camp 2/3rds down the river, I watched the sun come up over a gentle mist rolling down the valley. When the sun hit the mist, it lit up a stunning golden. One of the most spectacular sights I have ever seen.
Season 2021/22
- 2022-Jan-14 to 2022-Jan-15 / 1.5 days / Packrafting / NOBO / GPT 74P Río Yelcho / Tobias Schorcht
Río Yelcho is a fast floating and wide River. It’s well documented in the Track files with a numerous of beautiful camps all along the way. There are 2 easy Rapids. The First one is class 2, if you take the more fun line and paddle through the waves on the right side. The chicken line (class 1) is on the very right side, where a portage is also possible. The second rapid is class 1 and leads you through some fallen trees. Enjoy!
Season 2020/21
Season 2019/20
Season 2018/19
Season 2017/18
Season 2016/17
Resupply and Accommodation
Resupply and Accommodation in nearby Towns
Resupply and Accommodation along the Route
Transport to and from Route
Permits, Entry Fees and Right-of-Way Issues
Links to other Resources
Retired Section Article GPT74P - Río Yelcho
Images
[[Archivo: | ]]
GPT74P: Río Yelcho | Hiking | Packrafting | |||||
Group | M: Sector Yelcho | Total | - | - | 51.4 km | 11 h | |
Region | Chile: Los Lagos (X) | Trails (TL) | - | - | - | - | |
Start | Puerto Cárdenas | Minor Roads (MR) | - | - | - | - | |
Finish | Chaitén | Primary Roads (PR) | - | - | - | - | |
Status | Published & Verified | Cross-Country (CC) | - | - | - | - | |
Traversable | Jan - May (Maybe: Sep, Oct, Nov, Dec) | Bush-Bashing (BB) | - | - | - | - | |
Packraft | Required | Ferry (FY) | - | - | - | - | |
Connects to | GPT71, GPT73P, GPT76 | Investigation (I) | - | - | - | - | |
Options | 6 km (Variants Only) | Exploration (EXP) | - | - | - | - | |
Hiking | Packrafting | Total on Water | 51.4 km | 100.0% | |||
Attraction | - | 5 (of 5) | River (RI) | 47.2 km | 91.7% | ||
Difficulty | - | 3 (of 5) | Lake (LK) | - | - | ||
Direction | None | Only ← | Fjord (FJ) | 4.2 km | 8.3% | ||
Comment | Hiking: Hiking not feasible | ||||||
Character | Valdivian Rain Forest, Sea Coast, Farmland, Settlers, River Packrafting, Fjord Packrafting | ||||||
Challenges | - |