14
ediciones
Cambios
→Season 2025/26
Day 1:
- Start from the bus drop-off before Bridge {50} [11.6/13].
Day 2:
- About 150m after the hut, cross Río Yumbel using tree trunks; water level is not important thanks to the natural “bridge”, but use the trunks furthest right and follow small blue ribbons back into the forest.
Day 3:
- Start at the beginning of low tide along the beach, negotiating many fallen trees, then a rocky section.
Day 4:
- Same route as on the way in back to the end of Route 9.
