Cambios

GPT27P - Alto Río Palena

93 bytes añadidos, 19:20 4 mar 2020
Section Length and Travel Duration
==Section Length and Travel Duration==
Section 27P is 103.5km and takes 2-2.5 days to complete. Together with Section 28P, the two sections are a total of 180km and take around 4-4.5 days.
==Suitable Section Combinations==
142
ediciones