Cambios

GPT01 - Cerro Purgatorio

5 bytes eliminados, 13:41 7 abr 2023
Regular Route (RR)
=Permits, Entry Fees and Right-of-Way Issues=
==Regular Route (RR)==
No permit or entry fees apply to the regular route but a high gate was build in 2021. If the the gate at waypoint "X, Gate {01} [11.2/787]" is locked, continue 2.1 km on the main road and take Option 2 (Filo Purgatorio).
4607
ediciones